We are making rapid progress on the 3 Top Fuel chassis at this point. Behind the scenes, wheels, motorplates, bodywork and driveline parts are also being manufactured. As with the upper seat loop, we have also used a single tube to fabricate the upper tire rail. Here we are checking the fit on the tail section. Once that is confirmed, these same parts are duplicated for the next 2 chassis. JVTop Fuel Chassis Construction